Server rack PDU: basic, metered, monitored and switched

A rack PDU is the power strip inside the cabinet, but the useful distinction is not the socket count, it is how much the unit tells you and how much it lets you control. The four levels are basic (distribution only), metered (total draw), monitored (network-reported, per-phase) and switched (per-outlet metering and remote on/off). We supply all four in 0U vertical and 1U horizontal formats from 16 A to 63 A.

Product families we supply

Product familyBrandCapacity / formatProduct page
NetShelter Rack PDU Advanced (9000 serisi)Schneider Electric0U/1U, metered and switchedView product
Rack PDU 2G (AP89xx)Schneider Electric8.6–17.3 kW; 208/230 V
Basic Rack PDUSchneider Electricbasic distribution, no metering
Geist Upgradeable rPDU (GU)Vertivfield-upgradeable monitoring moduleView product
Geist Basic / Metered / Monitored / SwitchedVertiv0U/1U; 16–63 A
Geist Switched POUVertivper-outlet switching
ePDU G3 BasicEatonno metering, 0U/1U
ePDU G3 Metered InputEatoninput metering
ePDU G3 Managed / Metered OutletEatonper-outlet metering and switching
G3 Universal Input (UPDU)Eatonuniversal input
Raritan PX3Legrandmetered / switched / per-outletView product
Raritan PX4Legrandcurrent generation, colour touch display
Server Technology PRO2 / PRO3XLegrandHDOT Cx outlets, alternating phase
Raritan Smart Rack ControllerLegrandsensor and access control
Switched Metered-by-Outlet (PDU81xxx)CyberPower1U/0U; 100–240 V; per-outlet metering and switching
Switched (PDU41xxx)CyberPower1U; 8 outlets; switched
Monitored (PDU31xxx)CyberPowerinput metering
Basic (PDU15/20/13 serisi)CyberPower0U/1U basic distribution

Product families we actually source. Capacities are the manufacturer’s stated series ranges, not a quotation. Exact order codes depend on voltage, outlet type, battery configuration and region and are confirmed on the quote.

Which one should you choose?

Basic or metered?

A basic PDU is the right answer only where the circuit is already metered upstream and nobody will ever ask how loaded the rack is. The moment you want to add a server without guessing, the metered version pays for itself. It is the cheapest way to stop breaker trips caused by arithmetic done from nameplate ratings.

Monitored or switched?

Monitored reports over the network so you can trend load per phase and alarm before a breaker opens. Switched adds per-outlet control: you can power-cycle a hung device without sending anyone to site, and you can see which outlet actually draws what. For a remote or unstaffed room, switched is usually cheaper than one site visit per year.

0U or 1U?

0U vertical mounts in the rear channel and costs no rack units. The default for a full cabinet. 1U horizontal is for short racks, wall boxes and cabinets where the rear channel is already occupied. In an 800 mm wide cabinet the 0U unit disappears into the side channel; in a 600 mm one it competes with the cabling.

Single feed or dual?

Dual-corded equipment wants two independent PDUs on separate circuits, ideally from separate UPS paths. That is the standard answer for redundancy inside the rack, and it is what makes a rack ATS unnecessary for equipment that already has two power supplies.

Amperage and outlet type

Size the PDU to the circuit, not the load: a 32 A PDU on a 16 A breaker helps nobody. Outlet mix matters as much: C13 for most servers, C19 for high-draw and blade chassis, and locking outlets where a bumped cable would take down a live device.

Do you need environmental sensors?

Most current PDUs accept temperature and humidity probes on the same network port. Two probes at the top and bottom of the cabinet cost very little and turn the PDU into the only monitoring the room needs.

Request a quote

Tell us the circuit rating, outlet mix and whether you need metering or switching. Quantities are usually two per cabinet: say how many cabinets and the quote follows.