Vertiv Geist rack PDUs: Basic, Monitored and Switched

Vertiv’s Geist rack PDU line spans four tiers built on the same rPDU platform. The references on this page are the stocked North America catalogue numbers Vertiv publishes with full electrical data; the tier is carried in the type column since it is not encoded in the reference itself.

Vertiv Geist rack PDU, top view of a horizontal outlet strip with colour-coded ports

Technical specification

ModelTypeInput plugOutletsCurrent / voltagePhaseForm factor
VP9562BasicNEMA 5-15P(10) 5-15R15 A, 120 VSingle-phase
VP9563BasicNEMA 5-20P(10) 5-20R20 A, 120 VSingle-phase
VP7541BasicNEMA L6-30P(20) C13 + (4) C1930 A, 208 VSingle-phase
VP8830Monitored, unit levelNEMA L5-20P(24) 5-20R20 A, 120 VSingle-phase
VP8841Monitored, unit levelNEMA L6-30P(36) C13 + (6) C1930 A, 208 VSingle-phase
VP8865Monitored, unit levelNEMA L21-30P(36) C13 + (6) C19 + (2) 5-20R30 A, 120/208 V WYEThree-phase
VP46301Monitored, unit level3P+E (IP44)(30) combination C13/C1960 A, 208 V DELTAThree-phase
VP51100Switched, unit levelNEMA 5-15P(6) 5-15R15 A, 120 VSingle-phase
VP8930Switched, unit levelNEMA L5-20P(24) 5-20R20 A, 120 VSingle-phase
VP8941Switched, unit levelNEMA L6-30P(20) U-Lock C13 + (4) U-Lock C1930 A, 208 VSingle-phase
VP8965Switched, unit levelNEMA L21-30P(18) U-Lock C13 + (6) U-Lock C1930 A, 120/208 V WYEThree-phase
VP8641Switched, outlet levelNEMA L6-30P(20) U-Lock C13 + (4) U-Lock C1930 A, 208 VSingle-phase
VP5665VSwitched, outlet levelNEMA L15-30P(30) U-Lock C13 + (6) U-Lock C1930 A, 208 V DELTAThree-phase

Source of the values: Vertiv Geist Rack PDUs brochure, stocked North America model table. K-69: the Excel entry named generic tier prefixes (BR/MN/MD/SW) rather than manufacturer references. The references above are the real stocked North America catalogue numbers published in the Vertiv Geist Rack PDUs brochure; the type column carries the tier since it is not encoded in the reference itself. This is a subset of the full stocked list. An en dash means the manufacturer does not publish that value; we do not fill it in with an estimate. Confirm every figure against the current manufacturer document before it is written into a contract.

The references we quote in this family are VP9562, VP9563, VP7541, VP8830, VP8841, VP8865, VP46301, VP51100, VP8930, VP8941, VP8965, VP8641 and VP5665V. Send us the load, the phase and the outlet count you need, and we will confirm availability and lead time.

Which one should you choose?

Unit level and outlet level are two different Monitored/Switched grades

Unit-level monitored or switched units report and control power for the PDU as a whole. Outlet-level units, such as VP8641, do the same per individual outlet. The step up in granularity costs more and is worth it exactly when you need to know or control a single connection, not the whole rack.

Daisy chaining changes how many network ports you need

Monitored and Switched units support fault-tolerant daisy chaining of up to 50 devices on a single IP address, so a row of intelligent PDUs does not need one switch port per unit. Plan the network for the row, and the switch port budget for a large deployment falls sharply.

208 V and 120/208 V WYE models are not the same input

VP8865 and VP8965 take 120/208V WYE three-phase input for higher combined load, while most of the range is single-phase 120 V or 208 V. Confirm the supply your switchboard actually delivers before choosing a WYE-input model.

High-temperature rated units cost more for a reason

Monitored and Switched units in this range are rated to 60 °C operating temperature against 45 °C for Basic units. If the rack sits in a hot aisle or an edge location without tight climate control, that rating is not a marketing number, it is the difference between reliable and marginal operation.

This is a subset of a much larger stocked list

Vertiv’s brochure lists more references than we carry here, covering additional plug types and outlet configurations. If none of the rows below match your circuit exactly, tell us the load, phase and outlet requirement and we will check the full stocked list with Vertiv.

Where it fits, and where it does not

Fits a rack that needs reliable Vertiv-branded power distribution at any tier from unmetered to outlet-level switched, especially in hot-aisle or edge locations where the 60 °C rating matters. Does not fit a requirement for the newer modular GU2 platform; that family’s page notes it separately.

What we need in order to quote it

  • Load in amps, voltage and single/three-phase supply
  • Unit-level or outlet-level monitoring/switching
  • Operating temperature at the installation location
  • Whether daisy-chained network management across a row is planned

Back to Rack PDU

Request a Quote

Tell us the usable capacity, the protocol and the delivery country. A priced quote comes back within 48 hours, usually with a second option so the trade-off is visible.

Request a Quote (EN)