Liebert ITA2 and GXT5: 1 to 40 kVA, rack or tower

Liebert ITA2 and GXT5 cover 1 to 40 kVA in rack and tower formats. GXT5 sits at the smaller end and ITA2 extends the range upward, which together take a site from a single communications cabinet to a well-populated server room. The 40 kVA ceiling is unusually high for a family that still installs like rack equipment.

Liebert ITA2 uninterruptible power supply, product photo
Liebert ITA2
Liebert GXT5 uninterruptible power supply, product photo
Liebert GXT5

Technical specification

Model codePowerInput / output voltagePhasesTopologyEfficiencyDimensions W×D×H (mm)WeightParallel / redundancyBattery type
Liebert ITA2 5 kVA5 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert ITA2 6 kVA6 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert ITA2 10 kVA10 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert ITA2 16 kVA16 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert ITA2 20 kVA20 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert ITA2 30 kVA30 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert ITA2 40 kVA40 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert GXT5-5000IRT5UXLN5 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert GXT5-6000IRT5UXLN6 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)
Liebert GXT5-8000IRT5UXLN8 kVA220/230/240 V (single-phase) or 380/400/415 V (three-phase)Single-phase or three-phase, by ratingOn-line double conversion, rack/towerUp to 95-96.5% on-line; up to 99% ECO12 V VRLA (internal module or external cabinet)

Source of the values: Vertiv Liebert ITA2 5-40 kVA brochure. The ITA2 brochure publishes four rack dimensions and five weights against seven ratings without a one-to-one mapping, so those cells are left blank rather than guessed. An en dash means the manufacturer does not publish that value; we do not fill it in with an estimate. Confirm every figure against the current manufacturer document before it is written into a contract.

The references we quote in this family are Liebert ITA2 5 kVA, Liebert ITA2 6 kVA, Liebert ITA2 10 kVA, Liebert ITA2 16 kVA, Liebert ITA2 20 kVA, Liebert ITA2 30 kVA, Liebert ITA2 40 kVA, Liebert GXT5-5000IRT5UXLN, Liebert GXT5-6000IRT5UXLN and Liebert GXT5-8000IRT5UXLN. Send us the reference if you already have one, or the load in kW and the runtime if you do not, and we will confirm availability and lead time.

Which one should you choose?

A wider ceiling than most rack classes

Many rack-format families stop near 20 kVA. Reaching 40 kVA in the same installation style means a server room can grow substantially before it needs a floor-standing frame, dedicated switchgear and a separate battery cabinet. On a site that dislikes electrical work, that is a real advantage.

GXT5 or ITA2

The two names mark different points in the range rather than different philosophies. Give us the load and the format and the model follows; comparing them feature by feature before knowing the kVA wastes a round of questions.

Format decides installation, not performance

Rack orientation puts the unit in the cabinet it protects and costs U. Tower orientation frees the U and takes floor space instead. Neither changes the electrical behaviour, so decide it from the room rather than the datasheet.

Runtime beyond the internal battery

Extending autonomy in this class means additional battery modules, and each module occupies rack units. Count the U you are giving up before promising a runtime figure, because in a full cabinet those units are the most expensive space on the site.

Where it sits in the cabinet

A rack UPS belongs at the bottom of the cabinet, which lowers the centre of gravity and lets battery packs stack above it. Plan the U layout before ordering, because moving live equipment to make room later is the expensive way to discover this.

Where it fits, and where it does not

Fits an edge site or server room from a single cabinet up to 40 kVA where installation should stay within IT scope rather than becoming an electrical project. Does not fit a data hall, and does not fit a load that will clearly exceed 40 kVA within the asset life.

What we need in order to quote it

  • Load in kVA and the growth expected in the room
  • Rack or tower, and the U free if rack
  • Input circuit rating and socket type
  • Runtime target and whether extended battery packs fit
  • Monitoring protocol and whether a network card is required

Back to UPS Systems

Request a Quote

Tell us the load in kW, the runtime you want and the delivery country. A priced quote comes back within 48 hours, usually with a second option so the trade-off is visible.